Container & Cargo

  The Containers ( 20/40 feet ) will undergo Third Party Inspection, Testing and Certification (TPI) but not limited to Document Review, Visual Inspection, Dimensional Inspection, Quantity Inspection, Packing Inspection, Marking and Sealing Inspection, Loading Inspection and Internal discontinuities examination. Ultrasonic Inspection as per ASTM A 609. Tension test to be conducted as per ASTM A370 and the Fitness certificate will be issued.

  PRODUCT SAFETY INSPECTION (PSI) for any shipment are enlisted but not limited to:

       Visual inspection, Quality, Quantity and packing control(s)

       Inspection and Verification of all documents related to production

       Inspection on quantity and weight of the shipment

       Take photos from all inspection steps and send them with your reports

       Inspection on Marking & Packing

       Container (20/ 40 feet ) visual inspection

       Loading supervision, documentation, sealing(Checking of the seals of each container)

       Prepare all documents including; packing list, Certificate of Origin, Bill of Ladling, Mill Declaration, Manufacturer’s Test Reports (MTC), manufacturer certificates and authorizations

Eng. Jithin Prakash
jithin@darlsco.com / 056 8386 734

Ms. Jane
jane@darlsco.com / 056 8386 731

  • Example
  • Example
  • Example
  • Example
  • Example
  • Example
  • Example
  • Example
  • Example
  • Example
  • Example
  • Example
  •  
  •    
  •  
  •